Customization: | Available |
---|---|
Product Type: | Wire |
Material: | Ni, Cr, Fe |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Alloy | % | Ni | Cr | Fe | C | Mn | Si | Cu | P | S |
Inconel 600 |
Min. | 72 | 14 | 6 | ||||||
Max. | 17 | 10 | 0.15 | 1 | 0.5 | 0.5 | 0.015 | 0.015 |
Aolly status | Tensile strength Rm N/mm² |
Yield strength R P 0.2N/mm² |
Elongation A 5 % |
Brinell hardness HB |
Density g/cm³ |
Melting Point °C |
Annealing treatment |
550 | 240 | 30 | ≤195 | 8.4 | 1370-1425 |
Solution treatment |
500 | 180 | 35 | ≤185 | 8.4 | 1370-1425 |
Alloys Name | Type | Dimension | ||
Inconel 600 | Wire | D=0.025mm~10mm | ||
Inconel 600 | Ribbon | W=0.4~40 | T=0.03~2.9mm | |
Inconel 600 | Strip | W=8~250mm | T=0.1~3.0 | |
Inconel 600 | Bar | Dia=8~100mm | L=50~1000 | |
Delivery-When the pre-payment is confirmed:
1)The requested products are in stock,we will send them out within 3 day
2)The raw material is in stock,we will send out the products within 10 days.
3)When we need to re-melt the material,it will take 20-25 days to send the products/
Shipping-By sea,by air,by express or other ways:
Southeast Asia |
7-9 days |
2-3 days |
|
The Middle East |
20-25 days |
3-5 days |
3-5 days |
India-Pakistan |
15-22 days |
3-5 days |
3-5 days |
Mediterranean |
28-30 days |
3-5 days |
3-5 days |
Europe |
28-35 days |
3-5 days |
3-5 days |
Africa |
40-45 days |
about 7 days |
about 7 days |
Australia |
18-32 days |
3-5 days |
3-5 days |
West of America |
12-15 days |
3-5 days |
3-5 days |
East of America |
25-35 days |
3-5 days |
3-5 days |
Middle and South America |
30-55 days |
about 7 days |
about 7 days |